Terminoloogia
Projektijuhtimise mõisted ühel lehel
Lühikesed selgitused meeskonna- ja projektijuhtimises kasutatavatele mõistetele. Hüppa kategooriasse või järgi iga selgituse all olevaid seoseid.
39 mõistet
Mõistete selgitused on inglise keeles.
Core Concepts
Task Management
- Dependency
- A situation where one task depends on the completion of another task. Visualized in Gantt view.
- Seotud: Task, Gantt Chart, Subtask
- Gantt Chart
- A view where tasks are visualized on a timeline. Start-end dates, dependencies, and progress tracking can be done.
- Seotud: Task, Timeline, Dependency
- Kanban Board
- A view where tasks are visualized in columns according to their status. Tasks can be moved between columns with drag & drop.
- Seotud: Task, Status, Workflow
- Priority
- The urgency and importance level of a task. Usually defined as Low, Medium, High, and Urgent.
- Seotud: Task, Status
- Status
- The current stage of a task. Examples: To Do, In Progress, In Review, Completed.
- Seotud: Task, Kanban Board, Workflow
- Subtask
- A small task that is part of a larger task. Subtasks may need to be completed for the main task to be completed.
- Seotud: Task, Dependency
- Task
- The smallest unit of work to be done in Poitim. Tasks have features such as title, description, assignee, priority, status, due date, and tags.
- Seotud: Project, Sprint, User Story, Subtask
- Timeline
- A view where tasks and projects are displayed chronologically. Ideal for date-based planning and tracking.
- Seotud: Gantt Chart, Task, Project
Project Management
- Goal
- A measurable result planned to be achieved. Can be used with OKR (Objectives and Key Results) methodology.
- Seotud: Roadmap, Milestone, Project
- Milestone
- A date or event marking an important stage in a project. Visualized in roadmap.
- Seotud: Roadmap, Project, Goal
- Project
- A structure where related tasks and goals are organized. Projects can contain sprints, user stories, and roadmaps.
- Seotud: Task, Sprint, User Story, Roadmap, Team
Agile & Scrum
- Acceptance Criteria
- Conditions that must be met for a user story to be considered completed. Must be testable and measurable.
- Seotud: User Story, Sprint
- Backlog
- A list of tasks and user stories that have not yet been planned or started. Items are selected from the backlog during sprint planning.
- Seotud: Sprint, User Story, Project
- Burndown Chart
- A chart showing the amount of remaining work during a sprint. Used to track sprint progress.
- Seotud: Sprint, Velocity, Story Points
- Sprint
- In Agile methodology, a time period where tasks planned to be completed within a specific time are collected. Usually 1-4 weeks.
- Seotud: User Story, Project, Burndown Chart, Velocity
- Story Points
- A relative unit used to measure the complexity of a user story. Fibonacci series (1, 2, 3, 5, 8, 13) is used.
- Seotud: User Story, Sprint, Velocity
- User Story
- A description of a feature or requirement written from the user's perspective. Written in the format "As a user...".
- Seotud: Sprint, Story Points, Acceptance Criteria
- Velocity
- The number of story points or tasks completed in a sprint. Used to measure team capacity and plan future sprints.
- Seotud: Sprint, Story Points, Burndown Chart
Team Collaboration
- Chat
- Real-time messaging between team members. Provides instant communication based on Socket.io.
- Seotud: Team, Notification
- Member
- A user included in a workspace or team. Members can have different roles and permissions.
- Seotud: Team, Workspace, Role
- Notification
- A system that informs users about important events. Notifications are sent for situations such as task assignments, comments, changes.
- Seotud: Task, Chat, Team
- Permission
- The authority of a user to perform certain operations. Managed with RBAC (Role-Based Access Control) system.
- Seotud: Role, Member, Workspace
- Role
- The permission level of a user in a workspace or project. Roles such as Admin, Member, Viewer can be defined.
- Seotud: Member, Permission, Workspace
Analytics & Reporting
- Dashboard
- A customizable control panel where project, task, and team metrics are visualized. Contains KPI cards, charts, and widgets.
- Seotud: KPI (Key Performance Indicator), Report
- KPI (Key Performance Indicator)
- Metrics used to measure success. Displayed as KPI cards in dashboards.
- Seotud: Dashboard, Report
- Report
- Detailed analysis about project, task, or team performance. Can be exported in PDF, Excel, CSV formats.
- Seotud: Dashboard, KPI (Key Performance Indicator)
Integrations
- API (Application Programming Interface)
- The interface that Poitim provides for programmatic access. Can be used for custom integrations and automations.
- Seotud: Integration
- Integration
- Poitim's connection with third-party services. Provides data synchronization with platforms such as Google, GitHub, ClickUp.
- Seotud: API (Application Programming Interface)
Klasyum
- Brand
- A structure where managed social media accounts are grouped in Klasyum. Each brand has its own content calendar and analytics data.
- Seotud: Klasyum, Post
- Content Calendar
- A calendar view where posts are planned and visualized in Klasyum. Date-based content planning can be done.
- Seotud: Klasyum, Post, Brand
- Klasyum
- The social media management module of the Poitim platform. Offers content creation, planning, publishing, and analytics features.
- Seotud: Brand, Post, Content Calendar
- Post
- Social media content created and planned in Klasyum. Can contain text, image, video, and link.
- Seotud: Klasyum, Brand, Content Calendar