المصطلحات
مصطلحات إدارة المشاريع في صفحة واحدة
تعريفات موجزة للمفاهيم المتداولة في إدارة الفرق والمشاريع. انتقل إلى فئة، أو تابع الروابط أسفل كل تعريف.
39 مصطلحًا
التعريفات معروضة بالإنجليزية.
Core Concepts
Task Management
- Dependency
- A situation where one task depends on the completion of another task. Visualized in Gantt view.
- ذات صلة: Task, Gantt Chart, Subtask
- Gantt Chart
- A view where tasks are visualized on a timeline. Start-end dates, dependencies, and progress tracking can be done.
- ذات صلة: Task, Timeline, Dependency
- Kanban Board
- A view where tasks are visualized in columns according to their status. Tasks can be moved between columns with drag & drop.
- ذات صلة: Task, Status, Workflow
- Priority
- The urgency and importance level of a task. Usually defined as Low, Medium, High, and Urgent.
- ذات صلة: Task, Status
- Status
- The current stage of a task. Examples: To Do, In Progress, In Review, Completed.
- ذات صلة: Task, Kanban Board, Workflow
- Subtask
- A small task that is part of a larger task. Subtasks may need to be completed for the main task to be completed.
- ذات صلة: Task, Dependency
- Task
- The smallest unit of work to be done in Poitim. Tasks have features such as title, description, assignee, priority, status, due date, and tags.
- ذات صلة: Project, Sprint, User Story, Subtask
- Timeline
- A view where tasks and projects are displayed chronologically. Ideal for date-based planning and tracking.
- ذات صلة: Gantt Chart, Task, Project
Project Management
- Goal
- A measurable result planned to be achieved. Can be used with OKR (Objectives and Key Results) methodology.
- ذات صلة: Roadmap, Milestone, Project
- Milestone
- A date or event marking an important stage in a project. Visualized in roadmap.
- ذات صلة: Roadmap, Project, Goal
- Project
- A structure where related tasks and goals are organized. Projects can contain sprints, user stories, and roadmaps.
- ذات صلة: Task, Sprint, User Story, Roadmap, Team
Agile & Scrum
- Acceptance Criteria
- Conditions that must be met for a user story to be considered completed. Must be testable and measurable.
- ذات صلة: User Story, Sprint
- Backlog
- A list of tasks and user stories that have not yet been planned or started. Items are selected from the backlog during sprint planning.
- ذات صلة: Sprint, User Story, Project
- Burndown Chart
- A chart showing the amount of remaining work during a sprint. Used to track sprint progress.
- ذات صلة: Sprint, Velocity, Story Points
- Sprint
- In Agile methodology, a time period where tasks planned to be completed within a specific time are collected. Usually 1-4 weeks.
- ذات صلة: User Story, Project, Burndown Chart, Velocity
- Story Points
- A relative unit used to measure the complexity of a user story. Fibonacci series (1, 2, 3, 5, 8, 13) is used.
- ذات صلة: User Story, Sprint, Velocity
- User Story
- A description of a feature or requirement written from the user's perspective. Written in the format "As a user...".
- ذات صلة: Sprint, Story Points, Acceptance Criteria
- Velocity
- The number of story points or tasks completed in a sprint. Used to measure team capacity and plan future sprints.
- ذات صلة: Sprint, Story Points, Burndown Chart
Team Collaboration
- Chat
- Real-time messaging between team members. Provides instant communication based on Socket.io.
- ذات صلة: Team, Notification
- Member
- A user included in a workspace or team. Members can have different roles and permissions.
- ذات صلة: Team, Workspace, Role
- Notification
- A system that informs users about important events. Notifications are sent for situations such as task assignments, comments, changes.
- ذات صلة: Task, Chat, Team
- Permission
- The authority of a user to perform certain operations. Managed with RBAC (Role-Based Access Control) system.
- ذات صلة: Role, Member, Workspace
- Role
- The permission level of a user in a workspace or project. Roles such as Admin, Member, Viewer can be defined.
- ذات صلة: Member, Permission, Workspace
Analytics & Reporting
- Dashboard
- A customizable control panel where project, task, and team metrics are visualized. Contains KPI cards, charts, and widgets.
- ذات صلة: KPI (Key Performance Indicator), Report
- KPI (Key Performance Indicator)
- Metrics used to measure success. Displayed as KPI cards in dashboards.
- ذات صلة: Dashboard, Report
- Report
- Detailed analysis about project, task, or team performance. Can be exported in PDF, Excel, CSV formats.
- ذات صلة: Dashboard, KPI (Key Performance Indicator)
Integrations
- API (Application Programming Interface)
- The interface that Poitim provides for programmatic access. Can be used for custom integrations and automations.
- ذات صلة: Integration
- Integration
- Poitim's connection with third-party services. Provides data synchronization with platforms such as Google, GitHub, ClickUp.
- ذات صلة: API (Application Programming Interface)
Klasyum
- Brand
- A structure where managed social media accounts are grouped in Klasyum. Each brand has its own content calendar and analytics data.
- ذات صلة: Klasyum, Post
- Content Calendar
- A calendar view where posts are planned and visualized in Klasyum. Date-based content planning can be done.
- ذات صلة: Klasyum, Post, Brand
- Klasyum
- The social media management module of the Poitim platform. Offers content creation, planning, publishing, and analytics features.
- ذات صلة: Brand, Post, Content Calendar
- Post
- Social media content created and planned in Klasyum. Can contain text, image, video, and link.
- ذات صلة: Klasyum, Brand, Content Calendar